Iowa Model Steam Engineers
0414101312a.jpg0502101551b.jpg0502101553b.jpg0502101552a.jpg

The rail on the panel bridge was haveing problems with sun kinks, so the deck was rebuilt and the rail relayed.

The railings on the bridge have been installed.

The mainline has been conected.  Now they are working on the siding with 50 feet more to lay.

151_5135.JPG151_5137.JPG0509101619a.jpg